From Concept to Collection: 6-Week Sprint
A practical timeline showing how a focused team can launch a refined capsule quickly.
Week 1 starts with theme definition, reference mapping, and technical constraints. Clear direction at this stage prevents expensive redesigns later.
Weeks 2 to 4 are dedicated to prototyping, fit revisions, and material finalization. We test each piece for comfort, durability, and style coherence.
Weeks 5 and 6 focus on pre-production and launch readiness. With disciplined checkpoints, a six-week sprint can produce a collection that feels deliberate—not rushed.